Blue Ox BX88273 Fuse Bypass Switch - Dual Mini-Fuse - Two Circuit

Ships directly from the manufacturer — saving you on shipping and freight costs in most cases. Delivery times are managed by the manufacturer; contact us for shipping updates.
Learn MorePlease Note : This is a custom fit product. Please verify fit before ordering. Fit Finder
Have a Question ? Talk to a specialist- Live chat or call 877-895-1276
Blue Ox Fuse Bypass Switch - Dual Mini-Fuse - Two Circuit
Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. Ths switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.
Product Details
Utilizing this switch bypasses the towed vehicle's fuse so you can tow your vehicle without draining its battery. It simply relocates your car's fuse with this bypass and integrated switch.
- Per the manufacturer: Never install a fuse with more than a 20 amp rating in the fuse bypass switch harness. Always match the amperage of the fuse in the fuse bypass switch harness to the fuse removed from the fuse panel.
- Installs permanently by mounting it near the fuse box
- Consult the owners manual for the towed vehicle to determine which fuse
must be removed from the towed vehicle.
WARNING: This product can expose you to chemicals including (LEAD) which is known to the state of California to cause Cancer, Birth Defects, or other Reproductive Harm. For more information go to www.P65warnings.ca.gov
Specifications
| Brand | Blue Ox |
|---|---|
| Length | 12 inch |
| Style Of Connection | Fuse panel |
Instructions
Compatibility
| Year | Make | Model | Category | Description |
|---|---|---|---|---|
| 2020 | Buick | Envision | Flat Tow Wiring | All Models |
| 2019 | Buick | Envision | Flat Tow Wiring | All Models |
| 2018 | Buick | Envision | Flat Tow Wiring | All Models |
| 2017 | Buick | Envision | Flat Tow Wiring | All Models |
| 2016 | Buick | Envision | Flat Tow Wiring | All Models |




